Find a Station
How to use FloodNav
Copyright and Credits
Data Accuracy
Privacy Policy
Site Information
River Basins
Thames
Loddon and Trib
River Basins
Thames
Loddon and Trib
Loddon and Trib
This Management Catchment is part of the
Thames
river basin and is managed by
The Environment Agency
View River Basin
Management Catchment Data
Catchment Status Visualisation
Select an upstream source
Cove Hazel Avenue
Crondall Pond
Tongham
Pyotts Bridge
Catchment Rainfall Summary
Basingstoke
3h Total
0.00 mm
20:30
(Jul 31)
-23:30
(Jul 31)
6h Total
0.30 mm
17:30
(Jul 31)
-23:30
(Jul 31)
12h Total
7.40 mm
11:30
(Jul 31)
-23:30
(Jul 31)
24h Total
12.20 mm
23:30
(Jul 30)
-23:30
(Jul 31)
Last 24h: Max 15m intensity at 12:00 (Jul 31)
5.50 mm
Camberley
3h Total
0.00 mm
20:30
(Jul 31)
-23:30
(Jul 31)
6h Total
8.30 mm
17:30
(Jul 31)
-23:30
(Jul 31)
12h Total
13.80 mm
11:30
(Jul 31)
-23:30
(Jul 31)
24h Total
20.20 mm
23:30
(Jul 30)
-23:30
(Jul 31)
Last 24h: Max 15m intensity at 18:00 (Jul 31)
8.10 mm
Operational Catchment Areas
Loddon
Catchment Stations
Arborfield Bridge
Basingstoke
Blackwater Bridge
Bramshill
Chineham
Cove Hazel Avenue
Crondall Pond
Crookham Village
Eversley
Farnborough
Lodge Farm
Longbridge Mill
Mayfield Road
Pyotts Bridge
Redlands Lane
Sheepbridge
Sheepbridge Weir Mill Stream
Sindlesham Mill
Swallowfield
Swallowfield Side Channel
Tongham
Twyford
Wokingham
FloodMapper
is an independent site and is not associated with any government bodies (e.g. Environment Agency).
Copyright ©
FloodMapper
2023-2024.
All Rights Reserved
You need to enable JavaScript to run this app.